This lot is occupied by Green Hydrogen Systems.
In April 2023, Green Hydrogen Systems delivered a 6MW PtX test facility to GreenLab’s Power-to-X test site, which is part of the EU-supported GreenHyScale project. Since then, both water and
nitrogen have been connected to the facility, and a signal connection has been performed.